Wika DPT-10 Manual de usuario Pagina 61

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 96
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 60
A
B
+
1
5
6
7
+
24
3
II
I
IIIIII
Fig. 45: Preferred installation for liquids
I DPT10
II 3-fold valve block
III Precipitator
1.5 Drain valves
2.4 Inlet valves
3 Breather valve
6.7 Vent valves on DPT10
A, B Blocking valves
Proceed as follows:
1 Close valve 3
2 Fill measuring system with medium.
Open valves A, B, 2, 4: Medium ows in
If necessary, clean the dierential pressure lines: - with gases by
blowing out with compressed air - with liquids by rinsing.
3)
For this purpose close valve 2 a nd 4, i.e. block the instrument.
Then open valve 1 and 5 so that the eective pressure lines blow
out/rinse.
After cleaning, clos e valves 1 and 5
3 Remove air from instrument:
Open valves 2 and 4: Medium ows in
Close valve 4: Minus side will be closed
Open valve 3: Equalisation plus and minus side
Briey open valve 6 and 7, then close again: Fill the measuring
instrument completely with the medium and remove air
3)
Arrangement with 5 valves.
Installation for liquids
Prepare the adjustment
Dierential pressure transmitter DPT10 - metal measuring diaphragm Probus PA 61
8 Set up
37245-EN-100120